Talk to our consultants
Perth Metro
(08) 9241 1600
South West
(08) 9792 2388
EnquireToday
Ventura ID

What does access requirements during construction mean?

In order to begin construction of your property development a 3.8m wide x 3.0m high access clearing is required on your site.

Items that can interfere with this access include existing structures on the site, trees on the block and overhanging trees.

If the required access is not available when it comes the construction of your properties then additional costs involved with materials handling will apply.

 

Earthworks